Construction of Bituminous Road (Including Reconstruction / Restoration of Structures) on Eastern Kosi Embankment from 0.00 to 123.772 Km, Eastern Kosi Main Canal (Right Bank) from 0.70 Km. to 1.13 Km. (Indian Portion). Client: Chief Engineer, Water Resources Department, Birpur (Supaul), Bihar. Value: 1430.00 Million.
- Execution of Restoration of Eastern Gandak Canal System including Gandak Barrage and its appurtenants under Rashtriya Sam Vikash Yojana (including Overall Implementation Schedule). Client: Chief Engineer, Water Resources Department, Valmiki Nagar, Govt. of Bihar. Value: 4490.00 Million.
- Dr. B.R. Ambedkar PCSS - (Package No. IV) - Detailed Investigation, Preparation of Designs, drawings, estimates, land plan schedules, and Excavation of Gravity canal Including Formation of Embankments, Construction Sluices, Cross Masonry and Cross Drainage works, linking of main canal, distributory system duly limning and excavation of field channels and its structures for an extent of 25,500 acres ayacut (From Km. 0.000 to Km. 71.50 of main canal) etc., Complete for the reach from Km. 28.500 to Km. 71.500 which Is taking off from the right bank of the proposed Barrage across River Pranahita near Tummidi Hetti (V) Kouthala (M) Adilabad District. Client: The Superintending Engineer, I & CAD, Medium Irrigation Projects Circle, Bellampally, Adilabad District. Value: 4188.10 Million.
- Detailed investigation and preparation of designs, Drawings, Estimates, Land Plan Schedules and excavation of gravity Canal Including Formation of Embankments, construction of sluices, Cross Masonary and Cross Drainage works. lining etc. complete for the reach Km.15.00 to 28.50 (KARJALLI TO SURAGAPALLV ) which is taking off from the right flank of the proposed barrage across River Pranahitha near Tummldi Hettl (V), Kouthala (M), Adilabad (D). Client: I & CADD, Medium Irrigation Projects Circle. Bellampally, Adilabad (D). Value: Rs. 1077.00 Million.
- Pkg. No. 30/6 - Investigation, design, excavation and lining of own Tunnel II for feeding to Owk reservoir and construction of adit on EPC turnkey contract. Client: Government of Andhra Pradesh -Irrigation and CAD (PW Dept), NCC- MAYTAS - ZVS (JV) (50-40-10). Value: Rs. 2005.60 Million.
- Galleru Nagari Sujala
Sravanthi Project Phase – I is a major
irrigation project intended to provide irrigation
facilities to 3.25 Lakhs acres in 3 Districts
of Kadapa, Chittoor and Nellore of Andhra
Pradesh and drinking water to a population
of 5.00 Lakhs living in 640 villages and towns
enroute the canal. The work contemplates construction
of Gandikota reservoir across Panna River
near Mangapatnam and construction of head
regulator and GNSS main canal from Km 0.00
to Km 24.330. Value : Rs.
2502.00 Million.
- Sriram Sagar Project Flood
Flow Canal: The main canal is contemplated
with a capacity of 623 cusecs from the river
Godavari and runs for a length of about 122.00
Km. The total area contemplated under the
canal system is 2, 20,000 acres is awarded
to the company in joint venture.Value
: Rs. 2100.60 Million.
- Lingala Canal:
The Chitravathi Balancing Reservoir
is a part of the TBP HLC system of canals.
The CBR Right canal i.e. Lingala Canal is
to serve both the drinking water and irrigation
needs for about 25000 acres in drought prone
areas in Kadapa District. Value : Rs. 1480.50 Million.
- Thotapalli
Barrage Scheme, Right Main canal from Km 52.45
to Km 107.00 (Package – II): The Right
Main Canal is of 107 Km in length. The reach
from Km 52.45 to Km 107.00 (Package-II) is
awarded to M/S Maytas-NCC JV. Value
: Rs. 1700.20 Million.
- Sanjay Sagar (BHA) Project:
The construction of spillway & earthen dam of
Sanjay Sagar (BHA) Project. Value :Rs.524.20
Million.
- Srisailam Right
Branch Canal: Investigation, design and execution
of widening of SRBC Main canal from Km 25.067 to
Km 56.775 and alternatives to CM & CD works
including all other allied works. Value
: Rs.2578.50 Million.
- Suru Reservoir: The construction
of Earthen dam and Canals on turnkey basis in Jharkhand
state. Value : Rs.396.00 Million.
- Ramatheertham Balancing Reservoir:
The formation of balancing reservoir of 1.514 TMC
near Ramatheertham (V) Chimakurthy (M) Prakasam
District Andhra Pradesh, on Ongole Branch Canal.
Construction of spillway in Western Earthen Band
and Excavation of Surplus Course Channel are the
Few components. Value : Rs.181.00
Million.
- BLIP lift – II: Design
& execution of stage – I & stage –
II pumping station of lift – II at Thirumalayapally
and Kothakota (V) of Kothakota (M) Mahabubnagar
district on EPC turnkey basis. . Value :
Rs. 3915.50 Million.
- Gundlakamma Reservoir: This reservoir near
Chinna Mallavaram (V), Maddipadu (M), Prakasam district,
Andhra Pradesh is contemplated to provide irrigation
facilities to 80,060 Ac. and to fulfill the drinking
water needs of Ongole Town and 43 other villages.
The work consists of formation of Right & Left
earth dams, spillway & formation of Right &
Left canals & their distributory system.
- Formation of Right Earth Dam of Length 4.05
Km, Right Head Sluice, Gorge Portion, Right Main
Canal and Left main Canal.
Value :
Rs. 2125.00 Million.
|
|
|