- Wadi Adai Al Amerat Road Project, Oman: 7.5 km road would be completed in 18 months. The project would involve the Construction of six new bridges of varying lengths, nine box culverts and one single lane bridge. The proposed alignment would pass through mountains involving approximately 6.3 million cubic meters cum rock cutting. Client : Diwan of Royal Court Office of the Head of Muscat Municipality, Muscat. Value: Omani Riyals 56.549 Million (about Rs. 5700 million).
- Dualization and Realignment of Al Amerat-Quriyat Road: Widening of existing Road - 25.65 Kms. Construction of New Road - 47.55 Kms., 10 Bridges, 6 Over Passes, 1 Under Pass and 3 Interchanges. Client : Diwan of Royal Court Office of the Head of Muscat Municipality, Muscat. Value: US $ 156.25 Million.
- Sohar Water Network Phase - I, Oman : Supply & Installation of 45 Kms. Asbestos Cement Pipeline with a dia. ranging from 400 mm. to 900 mm., 295 Kms. of Secondary water distribution pipelines with a dia. ranging from 100 mm to 300 mm., 281 Kms of HDPE Pipeline with a dia. ranging from 100 mm. to 200 mm., 3 Pressure Reducing Valves, Waste Meters in the network, Construction of Tanker Filling Stations, Buildings for Laboratory, Workshop, Office, Stores etc. Value: US $ 25.13 Million.
- Salam Resort & Spa, Yitti, Oman : Bulk Rock filling Works & West Hillside Enabling Works. Carting of rock material from outside source, Dumping, Spreading and Compacting -1,000,000 m3. Construction of Mountain Roads and Platforms for Buildings.
Value: US $ 31.77 Million.
|
|
|